January 2025
ONLINE ONLY
FREE SHIPPING

Friendly Dog Collars NERVOUS Long Lead 1pc

Product ID: 8003307

1 / 3

$40.49

$4.50 Off RRP

Don't Pay RRP $44.99

See delivery and pickup options

This item is sold and delivered by Friendly Dog Collars . Separate delivery charges may apply - delivery calculated at checkout. To learn more about Online Only products, view our Help Centre.

VIEW HELP CENTRE

Friendly Dog Collars is a unique range of colour coded dog accessories based on the simple traffic light system and is designed to help prevent incidents BEFORE they occur by letting others know if your dog is approachable or requires space. Available in over 30 countries.

Shipping

FREE SHIPPING ON ALL ORDERS Our goal is to deliver your purchase as quickly as possible. All orders have a processing time of 24 hours, and delivery is between 2 – 7 working days. You will receive an email confirming the dispatch of your order once it has been sent along with your Australia Post tracking number.

Returns

Returns / Refunds Policy

I would like a refund... Please return item to 15/24 Tarcoola Cr, Surfers Paradise QLD 4217 • Item must be unused and tags included (okay if not attached) • Include a note with order number and/or name • Include a note requesting refund Once received we will reach out to confirm item has been received and will process refund provided items are unused.

Faulty Item Although we pride ourselves on the exceptional quality of our products it is not unheard of for the odd faulty item to slip through the manufacturing process. If this has happened to you I sincerely apologise. In this event, please email us and include photos of faulty items and a refund will be organised.

​Our goods come with guarantees that cannot be excluded under the Australian Consumer Law. You are entitled to a replacement or refund for a major failure and for compensation for any other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if goods fail to be of acceptable quality and the failure does not amount to a major failure.

Contact information

Phone

0418 674 447

Email

[email protected]

Hours

8.00 am to 6.00 pm 7 days

Features

180cm (6ft) in length 25mm width  Made from polypropylene Luxury padded neoprene handle Wording embroidered x 4 on each side  Nickel plated clips Machine washable

Dexil Limited/Friendly Dog Collars takes no legal liability or responsibility for the use or misuse of the products. It is the purchasers/dog owners sole responsibility to ensure correct colour/worded item for the intended dog and understand that no individual guidance can be given. The colour coded system is to be used as a guide only. Please ensure that responsible dog owners ship is adhered to at all times. At no time should you leave a dangerous dog unattended in a public area. Our products are to be strictly used as a tool only to help others identify if your dog is approachable or needs space. All products are Registered, Copyright, Intellectual Property Pending ensuring that there are no other products like it on the market. Friendly Dog Collars is part of the Dexil family. Produced in China for Dexil Limited.